The school-within-a-school concept supports two distinct student bodies: a K-2 program and a 3-5 program. Each building functions as a school-within-a-school serving a total population of 1300 students. SG developed the three elementary schools as sister schools of the same design. After extensive evaluation of options and District cost impacts, it was determined that three new elementary schools would be developed to replace the nine existing and aging elementary structures and subsequently provide significant savings for the future. The facility assessments and feasibility study, along with an independent demographics analysis performed by DecisionInsite, led the district to a conclusive direction for major District-Wide capital improvements. SG was engaged to complete a District-Wide Feasibility Study for the Bristol Township School District (BTSD) that included existing facility assessments of nine elementary schools, three middle schools and a high school.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |